3-2.Removal of the fixing bolts from the machine; 3-3. Installation of the spool stand; 3. Installation- Page 11

Brother BAS-761 User Manual

2014 Dodge Charger SRT Owner Manual

Table of Contents

Go to Instruction Manual Top Page
background image

4

BAS-761

3-2.Removal of the fixing bolts from the machine

The machine head and the sewing clamp arm are fixed with bolts to secure them during transportation.

Remove fixing bolt 

q

 on the machine head through the hole in the front cover.

Note:

¡

Save removed fixing bolts 

q

 future use.

¡

Before transporting the machine be sure to secure it with the fixing bolts.

3-3. Installation of the spool stand

Install the spool stand as shown in the illustration at left.

q

3. Installation

Detailed Information for Brother BAS-761 User Manual

Lists of information found in Brother BAS-761 User Manual - Page 11

  • 2.Removal of the fixing bolts from the machine The machine head and the sewing clamp arm are fixed with bolts to secure them during transportation.
  • 3. Installation of the spool stand Install the spool stand as shown in the illustration at left.

Related Documents for Brother BAS-761 User Manual