7
BAS-761
3-8. Installation of the folding group assembly
Before installation
¡
Apply air pressure.
¡
Turn on power switch
q
to return the machine to the home position.
¡
Turn valve switch
w
to OFF (lower) side and "E-820" will flash on the display.
1.
Install folding clamp assembly
e
onto folding base
r
.
2.
Attach multi-connector
t
.
3.
While pushing the folding clamp assembly
e
downwards with your hand, install the inner clamp assembly
y
to
the folding base
r
. For models with a label attachment device
u
, install the plug
i
of the label attachment device
u
to the socket
o
.
At this time, set the label attachment device
u
so that it is in a ready condition on top of the inner clamp assembly.
(Refer to page 27.) If it is reversed, it will turn downward.
4.
Install center blade assembly
!0
on folding base
r
.
5.
Install sewing clamp assembly
!1
on sewing clamp assembly arm base
!2
.
6.
Install the multi-connector
!4
and the dual sensor harness assembly
!3
.
7.
Set the valve switch
w
to ON (up position).
The "E-820" indication will disappear from the display panel and the panel will return to its previous condition.
8.
Move folding clamp assembly
e
, inner clamp assembly
y
, center blade assembly
!0
and sewing clamp assembly
!1
back and forth, and right and left, to ensure they are secured.
o
i
t
w
r
!0
q
!1
!3
u
y
e
@1
!4
3. Installation
!2