12
BAS-761
5-5. Thread tension
w
q
r
e
Stitches when upper
thread tension is too low
Stitches when upper
thread tension is too high
Correct stitches
1.
When the thread take-up lever is in the highest position after thread trimming, adjust the upper thread beyond the
needle eye so as it is 30 to 40 mm long, by turning tension nut
q
. (30 - 70 g is standard).
2.
Adjust the lower thread tension by turning tension regulating screw
w
. (40 - 60 g is standard.)
3.
Adjust the upper thread tension by turning tension nut
e
and
r
after lowering the presser foot.
Note:
Then adjust the tension 30 - 40 g by turning tension nut
r
.
Main adjust is performed by using tension nut
e
.
x2.4 rotary hook 150 - 200 g is standard.
x1.7 rotary hook 200 - 220 g is standard.
â–
Thread take-up spring
1.
The standard height of the thread take-up spring
q
is when the stroke is 5 to 8 mm.In addition, the standard tension
in the thread take-up spring is 30 g to 60 g (x1.7 rotary hook 40 - 80g).
(The tension in the thread take-up spring when it is pulling the upper thread straight to the side at the point where
the spring starts to move.)
2.
To adjust the thread take-up spring height, loosen set-screw
w
and turn the whole unit of the tension regulator
assembly.
3.
To adjust the thread take-up spring force, insert a screwdriver tip into the groove of tension stud
e
and turn it as
much as is appropriate.
Low
High
w
e
q
q
30 - 60g
5 - 8mm
5. Correct operation
â–
x2.4 rotary hook
â–
x1.7 rotary hook
w
Low
High
e
â–
x2.4 rotary hook
â–
x1.7 rotary hook
(
)
â–
x2.4 rotary hook
â–
x1.7 rotary hook
e
40 - 80g