Operation Manual
DBC Network Bridge
page 16
3.1 Unpack and Install Your
DBC Network Bridge
Please unpack and inspect your product for any
damage that may have occurred during transit.
If damage is found, notify the transportation
company immediately. Only you can initiate a
claim for shipping damage. Crown will be
happy to help as needed. Save the shipping
carton as evidence of damage for the shipper’s
inspection.
We also recommend that you save all packing
materials so you will have them if you ever
need to transport the unit.
Never ship the
unit without the factory pack.
YOU WILL NEED (not supplied):
•
Input wiring cables
•
Network cables
•
Rack for mounting the DBC Network
Bridge (or a stable surface for stacking)
WARNING: Before you start to set up
your DBC Network Bridge, make sure
you read and observe the Important
Safety Instructions found at the begin-
ning of this manual.
CAUTION: Before you begin, make sure
your DBC Network Bridge is discon-
nected from the power source.
Use a standard 19-inch (48.3 cm) equipment
rack (EIA RS-310B). See Figure 3.1 for dimen-
sions.
You may also stack units without using a
cabinet.
NOTE: When transporting, units should be sup-
ported at both front and back.
3.2 Connecting to AC Mains
WARNING: The third (ground) prong of
the AC power cord connector is a
required safety feature. Do not attempt
to disable this ground connection by
using an adapter or other methods.
3 Setup
Figure 3.1 Dimensions