Fig. 4-39; Fig. 4-40- Page 92

Brother 1250 User Manual

2014 Dodge Charger SRT Owner Manual

Table of Contents

sm_hl12er.pdf
PR99188.pdf
background image

CHAPTER 4  DISASSEMBLY AND RE-ASSEMBLY

4-22

(14) Lift and remove the heat roller.  The heat roller gear will also come off.

(15) Remove the heat roller bearing from the left hand end of the heat roller.  To remove the

bearing at the gear side, first remove the two washers, then remove the bearing.

Fig. 4-39

!

CAUTION:

Never touch the surface of the heat roller.

NOTE:

• 

When re-assembling the heat roller to the fixing unit frame, place the two projections at the
right hand side of the roller onto the bosses on the frame as shown in the figure below.

Fig. 4-40

Heat roller

Heat roller bearing

Heat roller gear

Heat roller bearing

Washer

Heat roller gear

Heat roller bearing

Heat roller

(projection)

(boss)

Washer

Detailed Information for Brother 1250 User Manual

Lists of information found in Brother 1250 User Manual - Page 92

  • When re-assembling the heat roller to the fixing unit frame, place the two projections at the right hand side of the roller onto the bosses on the frame as shown in the figure below.

Related Documents for Brother 1250 User Manual